Omokoroa 170704 Wastewater CB
NEXT PREV

Omokoroa Peninsula Waste Water

INTRODUCTION

The Omokoroa peninsula near Tauranga were all on septic tanks and this project entailed reticulating a new sanitary sewer system throughout, together with pump stations to pump the waste into Tauranga for treatment. We were commissioned by Works (Downer) to prepare and monitor the programme during construction.

The new system includes a 14.5km connection to Tauranga's waste water.

Included 30km of reticulation and eight pump stations.

Similar Projects